Material Takeoff
Menu

Linear lumber cut planner

Assign finished parts to stock with explicit kerf and end trim.

Stock & finished parts

Hypothetical starter inputs. Replace with measured project values. Results are temporary until exported.

Your cutting schedule

4
stock boards
10
parts
79.2%
part yield

1.25 in kerf + 2 in end trim + 76.75 in unallocated remainder.

Longest-first, first-fit plan; not a guaranteed minimum. One kerf is reserved per part, including the final part. This conservative convention may reject an exact end fit. All parts must use the same cross-section and material.

Board-by-board layout

Board 1
40
40
Board 2
40
40
Board 3
24
24
24
Board 4
24
24
24
Bars show part lengths relative to stock. Remaining gray includes kerf, trim and offcut; exact values are in the schedule.
Stock boardParts (in)Remainder (in)
1Long rail 40 + Long rail 4015.25
2Long rail 40 + Long rail 4015.25
3Short rail 24 + Short rail 24 + Short rail 2423.13
4Short rail 24 + Short rail 24 + Short rail 2423.13

Keep a private record

Sign in to private projects to save this snapshot across sessions. Each save creates a named project record; it does not submit an inquiry.

Review material inquiry
Before ordering

Check grade, face quality, grain matching, defects and available stock lengths. This is a linear cut plan, not a structural layout, sheet nesting tool or saw-operation instruction.

Understand kerf and trim ยท Understand actual volume and tally